younifyd
Menu

/api/inspect_bookings/checkPlannedInspectDateInSchedule (Check plannedInspectDate in schedule)

Check plannedInspectDate in schedule

GET/api/inspect_bookings/checkPlannedInspectDateInSchedule

Use it in a workflow

  1. Add a step and choose the TradeBeyond connector.
  2. Pick the /api/inspect_bookings/checkPlannedInspectDateInSchedule (Check plannedInspectDate in schedule) action (under InspectBookingController).
  3. Fill in the fields below, then reference the result from later steps as {{apiInspectBookingsCheckplannedinspectdateinscheduleCheckPlannedinspectdateInSchedule.response.data}}.

Request

Query parameters

idstringrequired
datestringrequired
afterDateinteger (int32)required

Response

Returns 200 with a boolean. Read it in later steps with {{apiInspectBookingsCheckplannedinspectdateinscheduleCheckPlannedinspectdateInSchedule.response.data.<field>}}.

Need more? See the TradeBeyond guide for connection setup and behaviour shared by every action.

/api/inspect_bookings/checkPlannedInspectDateInSchedule (Check plannedInspectDate in schedule) — TradeBeyond — Documentation